Tuesday, 26 June 2012

27th June

Tools used: hammer, clippers, air stapal gun

today was spent on putting up chicken wire across the roof to stop the building paper from sagging.

This was done by rolling out a roll of the wire across the bottom. [first length already done] The second length was rolled out across the entire length of the roof, then stapaled along the bottom run. The sides were snipped. Then 2 of us stretched the wire up to the top purlin and was stapaled. This was repeated the entire length. Then the side were stretched and stapaled.

Then the process was repeated across the other side. Same for the end

 

No comments:

Post a Comment