Showing posts with label roof cladding. Show all posts
Showing posts with label roof cladding. Show all posts

Thursday, 23 August 2012

20th - 21st - 22nd August

This week was sspent finishing off the wall clading and roof cladding and scribers
 
Wall cladding - the final weather board along the top of the windows. Window head flashing had to be put in, then tape along the top edge to weather proof, from there, the weather board had to be cut to fit with bevel edges to join the next one onto.
   
   
Corners then could be finished off, with the cut back level and primed. Then the facing board put on, finishing with the scribers
   
Roof clading was just about finished, with another sheet required. Then the capping can be put up.

Tuesday, 26 June 2012

27th June

Tools used: hammer, clippers, air stapal gun

today was spent on putting up chicken wire across the roof to stop the building paper from sagging.

This was done by rolling out a roll of the wire across the bottom. [first length already done] The second length was rolled out across the entire length of the roof, then stapaled along the bottom run. The sides were snipped. Then 2 of us stretched the wire up to the top purlin and was stapaled. This was repeated the entire length. Then the side were stretched and stapaled.

Then the process was repeated across the other side. Same for the end