14th May
Today we finished the contruction of the interior frames
Then went on to the exterior frames
Sunday, 13 May 2012
Tuesday, 8 May 2012
9th May
Today we went up to the other build and started to put up the ceiling gib
Had a run down on how to apply the adhesive 200, 400 800, 1m, making sure not to screw through the adhesive.
Where and how far apart the screws go in
Measuring and cutting each sheet of gib , cutting out holes for the lights
How to lift the sheets into place and screwing them in
Today we went up to the other build and started to put up the ceiling gib
Had a run down on how to apply the adhesive 200, 400 800, 1m, making sure not to screw through the adhesive.
Where and how far apart the screws go in
Measuring and cutting each sheet of gib , cutting out holes for the lights
How to lift the sheets into place and screwing them in
Monday, 7 May 2012
8th May
Tools:- 8m tape, 1m fold rule, sharp pencil, square, radial arm saw, compressed air nail gun
Hazards:- radial saw, nail guns [noise, miss use of these tools]
Protective Gear:- ear muffs and safety boots, safety glasses
morning session was spent on group presentation on piles [1 hour]
the rest of the day was spent measuring the last of the bottom and top plates, then we started tp nail them together - studs, timmers, blocks and gwangs, then the lintel, finished off with the jack studs
morning session was spent on group presentation on piles [1 hour]
the rest of the day was spent measuring the last of the bottom and top plates, then we started tp nail them together - studs, timmers, blocks and gwangs, then the lintel, finished off with the jack studs
Sunday, 6 May 2012
7th May
The rest of the day was sent out finishing of marking all the top and bottom plates. Then we started to put the frames together
- Tools:- 8m tape, 1m fold rule, sharp pencil, square,
- Hazards:- frames laid out so had to be careful not to trip over them / noise from the saws and nail guns
- Protective Gear:- ear muffs and safety boots
The rest of the day was sent out finishing of marking all the top and bottom plates. Then we started to put the frames together
Tuesday, 1 May 2012
2nd may
Then we did an exercise describing each part, giving it to another student to work out what we had just described

The rest of the day was sent making in all these parts on the bottom and top plates
- tools: 30m tape, 8m tape, fold rule, pencil [sharp], sliding square
Then we did an exercise describing each part, giving it to another student to work out what we had just described
The rest of the day was sent making in all these parts on the bottom and top plates
Monday, 30 April 2012
1st May
Then some of us went on to do 'Dove tail wall plate joints' [5.5 hours]

First we had to change some of the measurements - 200 to 300 / 47 to 45
Then from the measurements worked out how long each piece of wood was - peice that had A & B joins was 45+90+300+90+45 =570mm / piece B&C was 90+300+90+45=525mm / piece C & D was 90+300+90=480mm / and piece A & D was 45+300+90+45=480mm
cutting the wood to these lengths we then measured out each piece to where each dove tail and sockets are going

Then using a hand saw [where we could] cut out the dove tails and sockets in strips then chiseled them out
- Tools: radial arm saw, hammer, chisel, sliding square, pencil [sharp], 8m tape, folding rule, sliding F clamp, hand saw
- safety equipment: ear muffs, safety glasses, safety boots
- Hazards: radial arm saw [clean work area / people safe distance / no loose clothing], chisel [keeping it sharp, chiseling away from you, keeping hands behind what you are chiseling]
Then some of us went on to do 'Dove tail wall plate joints' [5.5 hours]
First we had to change some of the measurements - 200 to 300 / 47 to 45
Then from the measurements worked out how long each piece of wood was - peice that had A & B joins was 45+90+300+90+45 =570mm / piece B&C was 90+300+90+45=525mm / piece C & D was 90+300+90=480mm / and piece A & D was 45+300+90+45=480mm
cutting the wood to these lengths we then measured out each piece to where each dove tail and sockets are going
Then using a hand saw [where we could] cut out the dove tails and sockets in strips then chiseled them out
Sunday, 29 April 2012
30th April
We started measuring 90mm in from each corner with our 8m tape [using our fold rules to make sure we are measuring off the boundry joist and not the flooe edge, as might be off by a couple of mm's

.
Then we worked on our apprentice dairies to make sure we are up to date and have put the right things in decribing what we have done over the last few weeks
A few of us also helped unload a truck of material
Just before afternoon break a couple of us started on the setting out the bottom and top plates
- Tools: 8m tape, fold ruke, pencil [sharp], chalk line, radial saw
- Safety equipment: safety boots, ear muffs, safety glasses
- Hazards: radial saw
We started measuring 90mm in from each corner with our 8m tape [using our fold rules to make sure we are measuring off the boundry joist and not the flooe edge, as might be off by a couple of mm's
.
Then we worked on our apprentice dairies to make sure we are up to date and have put the right things in decribing what we have done over the last few weeks
A few of us also helped unload a truck of material
Just before afternoon break a couple of us started on the setting out the bottom and top plates