Showing posts with label gib fixing. Show all posts
Showing posts with label gib fixing. Show all posts

Wednesday, 13 June 2012

13th June

Tools used: 8m tape, fold rule, knife, pencil, straight edge, corking gun with gib adhesive, screw gun, small saw to cut out small holes in the gib, hand saw to cut bigger holes

Most of the day was up at the other build carrying.

We had to clear and clean areas we were going to store and hang the gib. When the gib turned up we had to unload it into the house.

From there Mark and Cam show us how to put up the gib, doing one wall in a room. Cutting the gib to length [being hang horizontal - only need 2 sheets per wall], then showing us to measure from only one side to cut out holes for the hot points, and also around windows.

Plus also learnt about the bracing element, were the screws were put in at 50, 50, 50, 75, 75, 150 from the top and bottom of the sheet, and at 200mm spacings

   

Tuesday, 8 May 2012

9th May

Today we went up to the other build and started to put up the ceiling gib
Had a run down on how to apply the adhesive 200, 400 800, 1m, making sure not to screw through the adhesive.
 Where and how far apart the screws go in
Measuring and cutting each sheet of gib , cutting out holes for the lights
How to lift the sheets into place and screwing them in