3rd April
Today we started with calulations, square meter area and the cube meters [approx 1.5 hours] then we went out to work on getting the piles set up right / plum and correct height.
Some of the temp piles were taken out and replaced.
The corner piles were then leveled and braced with 100mm by 50mm 2.5 meter long
Tools used : builders level / hammer / 8meter tape measure / spirit level
Power tools : nail gun